Contract - Gelfand Partners Architects

design - features - green design



Gelfand Partners Architects

27 December, 2011

-By John Czarnecki



Seeking a new home for her 35-employee firm, Lisa Gelfand, FAIA, purchased a San Francisco building that had been built in 1890 as a public bath house and converted it into the office of Gelfand Partners Architects. Severely damaged in the 1906 earthquake, and subsequently housing a commercial laundry and other light industrial uses, the building has a spine of skylights that is perfect for daylight. The author of Sustainable Renovation: Strategies for Commercial Building
Systems and Envelope (Wiley, 2012), Gelfand and her colleagues consider the office to be a laboratory for high performance design related to renovation. Low-ambient task lighting illuminates the architecture studio space, and radiant heat was installed at ceiling level. The new mezzanine, independent of the original structure, allows for eight workstations above and five semi-enclosed offices below. Custom perforated FSC-certified plywood panels in the ceiling conceal new thermal and acoustic insulation, as well as reflect indirect lighting. Overhead fans maintain air flow, and new wall-to-wall steel tubes provide seismic bracing without obstructing the skylight. The renovation earned Gold in LEED® for Commercial Interiors. 

 

Gelfand Partners Architects office. Architect Gelfand Partners Architects. Where San Francisco. What 7,891 total square feet on one floor with
mezzanine. Cost/sf $84, including seismic retrofit.




Gelfand Partners Architects

27 December, 2011


Mark Luthringer

Seeking a new home for her 35-employee firm, Lisa Gelfand, FAIA, purchased a San Francisco building that had been built in 1890 as a public bath house and converted it into the office of Gelfand Partners Architects. Severely damaged in the 1906 earthquake, and subsequently housing a commercial laundry and other light industrial uses, the building has a spine of skylights that is perfect for daylight. The author of Sustainable Renovation: Strategies for Commercial Building
Systems and Envelope (Wiley, 2012), Gelfand and her colleagues consider the office to be a laboratory for high performance design related to renovation. Low-ambient task lighting illuminates the architecture studio space, and radiant heat was installed at ceiling level. The new mezzanine, independent of the original structure, allows for eight workstations above and five semi-enclosed offices below. Custom perforated FSC-certified plywood panels in the ceiling conceal new thermal and acoustic insulation, as well as reflect indirect lighting. Overhead fans maintain air flow, and new wall-to-wall steel tubes provide seismic bracing without obstructing the skylight. The renovation earned Gold in LEED® for Commercial Interiors. 

 

Gelfand Partners Architects office. Architect Gelfand Partners Architects. Where San Francisco. What 7,891 total square feet on one floor with
mezzanine. Cost/sf $84, including seismic retrofit.

 


Post a Comment
Asterisk (*) is a required field.
*Username: 
*Rate This Article: (1=Bad, 5=Perfect)

*Comment:
 




follow us

advertisement


advertisement






advertisement


advertisement




Contract Magazine is devoted to highlighting creative interior design trends and ideas that are shaping the industry on a daily basis. Contract is proud to provide you with the most comprehensive coverage of commercial interior design products and resources that procure uniqueness when designing a space. Contract is the modern interior design magazine that recognizes fresh interior design ideas and projects powerful interior design resources.

 

Contract Magazine Home | Interior Design News | Interior Planning Products | Interior Design Research | Interior Design Competitions | Interior Design Resources | Interactive Interior Designing | Digital/Print Versions | Newsletter | About Us | Contact Us | Advertising Opportunities | Subscriber FAQs | RSS | Sitemap

© Emerald Expositions 2014. All rights reserved. Terms of Use | Privacy Policy